Translations:Tabor/Obsługa/Obsługa i sterowanie EP09/245/en: Revision history

From TTSK

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 August 2025

  • curprev 08:3008:30, 12 August 2025 Maszn talk contribs 222 bytes +222 Created page with "The next sterp is to turn on the compressor (<code>C</code> key) and wait for the main reservoir to fill up. Then the pressure gauge of the main reservoir exceeds 5 bar, you can proceed to fill the break pipe with the air."