Translations:Instrukcja SWDR4/32/en: Difference between revisions
From TTSK
Importing a new version from external source |
No edit summary |
||
| Line 1: | Line 1: | ||
Every scenery has its own set of route blocks for external routes, one for each route track. For double - trakc routes, the blocks for "tracks in the opposite direction to the main track ("left") are listed on left, while those for "tracks in the main direction ("right") are listed on the right. Remember that rail traffic in Poland is right - hand traffic, and driving on the "left" track is subject to special conditions after prior agreement with the traffic controller of the next scenery to which you are sending the train. In the case of single - track routes, there is no distinction between right and left tracks. | |||
Latest revision as of 22:21, 26 February 2026
Every scenery has its own set of route blocks for external routes, one for each route track. For double - trakc routes, the blocks for "tracks in the opposite direction to the main track ("left") are listed on left, while those for "tracks in the main direction ("right") are listed on the right. Remember that rail traffic in Poland is right - hand traffic, and driving on the "left" track is subject to special conditions after prior agreement with the traffic controller of the next scenery to which you are sending the train. In the case of single - track routes, there is no distinction between right and left tracks.
