Main public logs
From TTSK
Combined display of all available logs of TTSK. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
- 13:53, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/432/en (Created page with "Fault description")
- 13:53, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/431/en (Created page with "Fault name")
- 13:53, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/430/en (Created page with "Fault table")
- 13:53, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/429/en (Created page with "File:Instrukcja_RASP-UZK-schematprzejazdu-1.png")
- 13:52, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/428/en (Created page with "Crossing's scheme")
- 13:52, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/427/en (Created page with "Fault table")
- 13:52, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/426/en (Created page with "The detailed course of action is shown in")
- 13:52, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/425/en (Created page with "A fault can occur when the crossing is in rest state - in RASP container every 30 seconds it's done PULS-TEST of all the crossing components, including the continuity of light bulb fibre")
- 13:52, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/424/en (Created page with "If there are no crossing warning signals, the speed will have to be reduced on the crossing using an appropriate written order")
- 13:52, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/423/en (Created page with "In case of appearing the fault of the 1st category it's necessary to reduce the maximal speed up to 20 km/h. The limitation is realised by showing the Osp1 signal on the crossing warning's signals (selectively for the track and direction or for all the signals). For faults of the 2nd category it isn't necessary to introduce the speed limitation on the crossing")
- 13:52, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/422/en (Created page with "Untypical situation")
- 13:52, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/421/en (Created page with "after opening: turning off the road signals")
- 13:52, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/420/en (Created page with "after opening: beginning of opening the entry barriers")
- 13:52, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/419/en (Created page with "after 6s: beginning of opening the exit barriers")
- 13:52, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/418/en (Created page with "after realeasing the crossing zone (zone C2C3): the TOP signal is turned off")
- 13:52, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/417/en (Created page with "after closing: waiting for a train for at least 6 seconds")
- 13:51, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/416/en (Created page with "after 16s: beginning of closing the exit barriers")
- 13:51, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/415/en (Created page with "after 8s: beginning of closing the entrance barriers")
- 13:51, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/414/en (Created page with "enabling road signals")
- 13:51, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/413/en (Created page with "showing the Osp2 signal on the crossing's warning signal right for the track and ride direction OR on all warning signals (synchronous mode) within 0,5s")
- 13:51, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/472/en (Created page with "If a crossing is activated by SRK elements, it's possible to activate the crossing manually within functional buttons described TorX CY (TrackX CY), where X is track number and Y is sensor number. After proper usage of the button the crossing starts closing cycle and an arrow (4.4Ft) changes its colour into green or a rectangular light of isolation (4F20) changes its colour into red. <big>WARNING!</big> After turning off the sensors the signalisation won't be turned on d...")
- 13:45, 2 August 2025 Eugenio07 talk contribs created page Translations:SUP/316/en (Created page with "Manual enabling the crossing via SRK")
- 18:51, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/412/en (Created page with "SSP work cyclus in the "classic" mode")
- 18:50, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/411/en (Created page with "after opening: turning off the road signals")
- 18:50, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/410/en (Created page with "after opening: beginning of opening the entry barriers")
- 18:50, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/409/en (Created page with "after 6s: beginning of opening the exit barriers")
- 18:50, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/408/en (Created page with "after realeasing the crossing zone (zone C2C3): the TOP signal is turned off")
- 18:50, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/407/en (Created page with "after closing: waiting for a train for at least 7 seconds")
- 18:50, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/406/en (Created page with "after time needed for a train to leave the crossing (counted from the crossing's length, normally about 12 - 15s): beginning of opening the exit barriers")
- 18:50, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/405/en (Created page with "after 13s: beginning of closing the entrance barriers")
- 18:50, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/404/en (Created page with "enabling road signals")
- 18:50, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/403/en (Created page with "showing for 0,5s Osp2 signal on the warning crossing signal right for the track and train ride direction")
- 18:50, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/402/en (Created page with "SSP work cycle in compatiblity mode with")
- 18:50, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/401/en (Created page with "initializes the work of crossing devices")
- 18:50, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/400/en (Created page with "Train riding on a turning on sensor")
- 18:50, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/399/en (Created page with "Typical situation")
- 18:49, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/398/en (Created page with "System's reaction for traffic situation")
- 18:49, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/397/en (Created page with "warning sequence (8-16-16-6 for old guidelines, 13-10-x-10-7 for the new ones, where x - minimal time of a train leaving a crossing)")
- 18:49, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/396/en (Created page with "train leaving time from the crossing")
- 18:49, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/395/en (Created page with "the minimal warning time for chosen category")
- 18:49, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/394/en (Created page with "Evaluation of the minimal distance of turning on sensors from the crossing including")
- 18:49, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/393/en (Created page with "Calculations")
- 18:49, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/392/en (Created page with "Working on the already definied railway crossings - changing their order, loading, saving the changes, deleting. Adding a new crossing takes place in a mark")
- 18:49, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/391/en (Created page with "SSP list")
- 18:49, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/390/en (Created page with "Defying the names of crossing warning's signals (in the editor without prefix - they're used only on sceneries) and track names and neighbour stations")
- 18:49, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/389/en (Created page with "Names")
- 18:49, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/388/en (Created page with "The choose of postioning between 2 to 8 road signals. The nummeration is ordered by the Editor - on the scenery road signals should be named in way which is shown in the following tab, adding also a prefix")
- 18:48, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/387/en (Created page with "Signalistaion")
- 18:48, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/386/en (Created page with "yes")
- 18:48, 1 August 2025 Eugenio07 talk contribs created page Translations:SUP/385/en (Created page with "no")
