Translations:Tabor/Obsługa/Obsługa i sterowanie EP09/245/en

From TTSK
Revision as of 08:30, 12 August 2025 by Maszn (talk | contribs) (Created page with "The next sterp is to turn on the compressor (<code>C</code> key) and wait for the main reservoir to fill up. Then the pressure gauge of the main reservoir exceeds 5 bar, you can proceed to fill the break pipe with the air.")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

The next sterp is to turn on the compressor (C key) and wait for the main reservoir to fill up. Then the pressure gauge of the main reservoir exceeds 5 bar, you can proceed to fill the break pipe with the air.