Translations:Instrukcja SWDR4/65/en

From TTSK
Revision as of 22:39, 26 February 2026 by Maszn (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
  • 4. For the rest of the process, follow the instruction for the Eap-94 route block. Details on how it works and how to use it can be found in wiki article (scroll down slightly to the section with graphical explanations of the block status).
  • 5. In the case of a route with a semi - automatic route block (PBL): after the train leaves the scnery, the block connection will be automatically terminated (if the DKo button option has not been changed in the system settings). This is intentional - the block for the destination scenery will still be in place, while to for the scenery sending the train, it will reset to its initial state in order to increase throughput! For route with automatic route block (SBL), the connection will be terminated after the train occupies the second SBL block of the departure route to the next scenery.