Translations:Instrukcja SWDR4/26/en

From TTSK
Revision as of 22:54, 26 February 2026 by Maszn (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Each component allows you to define the characteristics specyfic to a given type (e.g., station stop time, shunting time, route length, number of tracks, etc.). Correct measurement of route lengths is important for accurate calculation of train travel times. In the case of stations with a large span, the rule should be that the routes end and begin at the point of service (e.g., in the middle of the platform or in the middle of thge freight yard).