Translations:Tabor/Obsługa/Obsługa i sterowanie EP09/245/en

From TTSK

The next sterp is to turn on the compressor (C key) and wait for the main reservoir to fill up. Then the pressure gauge of the main reservoir exceeds 5 bar, you can proceed to fill the break pipe with the air.